Jaurdi Gold Project

Electrical installation of a processing plant

Partnering with Beacon Minerals.

THE BRIEF

We were tasked with the electrical installation of a processing plant for Beacon Minerals. In doing so, we had to develop an electrical design that caters for future changes whilst minimising the initial cost outlay.

THE CHALLENGE

The project was fast-tracked before the mechanical design was completed.

THE RESULTS

Kinetiq designed site PID’s and functional specifications. This produced a neat and automated plant that reduced originally proposed staffing levels for day-to-day operations, significantly reducing initial and ongoing costs.

THE SCOPE

  • Safety management.
  • Design (HV and LV).
  • Drawings. 
  • Function specifications and control requirements.
  • Procurement. 
  • Lightning protection.
  • Data and comms for site.
  • Site management, supervision, and personnel.
  • Installation and test equipment hire.
  • Commissioning and handover.

THE FEEDBACK

“Kinetiq showed initiative, identified potential issues, and completed works before there was any holdup to site installation. We were very impressed with their capabilities and motivation onsite. The final product is a quality processing plant beyond our expectations. 

Their experience ensured the right equipment was installed, and installed correctly. To achieve the engineering requirements that Kinetiq provided would have cost us many hundreds of thousands of dollars more, had we gone to a large engineering house for these works. They were able to keep the costs down by doing work in-house and ensuring tasks were completed correctly the first time.”

— Beacon Minerals